Project Details
LEARN MORE
See below for the project schedule, documents, studies and deliverables. Stay tuned as more are added.
PROJECT SCHEDULE
NEXT STEPS
With a Planning Study completed in 2022, the Inner Loop North project has moved from conceptual design into the engineering design phase. During this phase, additional studies and investigations are being completed to determine final project details, such as identifying what form pedestrian and bicycle infrastructure will take and how traffic flow may be modified. Parallel to engineering, the City is developing more detailed plans for what new redevelopment and green spaces may look like. There will continue to be extensive opportunities for public feedback on all aspects of the project. At the conclusion of design, the project will go out to bid, a contractor(s) will be selected, and construction will begin. Construction will be phased over multiple years to ensure limited impacts to residents and businesses that rely on the Inner Loop for access.
.
Preferred Alternative
Final Design & Engineering
Construction
Infill Development
MOBILITY AND DEVELOPMENT STRATEGY
Parallel to the design of a new street network to replace the Inner Loop North, the City of Rochester is developing a strategy for land use and redevelopment in the project area. For more information on the Mobility and Development Strategy, please visit cityofrochester.gov/innerloopnorth.
PROJECT DOCUMENTS
Click below to view each document
Project Scoping Report Documents
Planning Study Documents